hangar deck. At 684 feet/208.5 meters long, 108 feet/33 meters wide, and 25 feet/7.6 meters tall, it is designed to provide a dry, safe place to store and maintain the aircraft of the embarked wing. As we walked forward, I passed several large access holes that led into the two nuclear reactor compartments below. These would be buttoned up shortly, my guides told me. The nuclear fuel packages would then be installed, followed by testing and certification of the twin A4W reactor plants. All around the hangar deck, workers were busy welding and installing pieces of equipment.
After climbing several ladders, we emerged on the flight deck, where hundreds more NNS workers were hustling about at their tasks, and then moved forward to the catapults, which were in the process of testing and certification. They are installed in pairs on the bow and the deck angle port-side, and each of the four 302- foot/92.1-meter-long C13 Mod. 1 catapults is capable of launching an aircraft every few minutes (the cycle time depends largely on the skill of the deck crew). Each catapult is powered by a pair of steam cylinders, which are built into the flight deck, and normally use high-pressure saturated steam from the reactor plant; but since the reactors were not yet powered up,
Testing such powerful machines is a dramatic procedure. Scattered around the deck were a number of orange-painted, water-filled, wheeled trolleys called deadweights. Each deadweight simulates a fully loaded aircraft, with attachment points that allow it to be hitched to the shuttle of a catapult. After the bow has been pointed into the James River channel, and the Coast Guard and local boaters have been suitably warned, each catapult fires the entire range of deadweights. The tests are noisy and the sight of the weights flying hundreds of yards/meters into the channel is bizarre. Nevertheless, this is a highly effective way to prove that the machinery is ready. After leaving the catapults, we headed aft to inspect the catapult control station between Catapults 1 and 2.[35] Set on a hydraulically raised platform under an armored steel door, the control station is a pod where the catapult officer-or 'shooter'-can control the catapults in safety and comfort. Another identical station is located on the port side, controlling Catapults 3 and 4.
Next we walked over to the island structure, where our guides showed us how the many systems on the flag and navigation bridges, the primary flight control, and the meteorology office were installed. Although the basic
As we moved farther aft, we passed by the kinds of tool sheds and other temporary storage buildings that you find at any construction site. Then we dropped down a ladder back to the hangar deck and down another into the bowels of the ship. At this point, the primary work on
Shortly after this job was completed, just after New Year's of 1998, the first of the Navy's crew of 'plankowners' arrived. Several of the ship's spaces that had already been turned over proved to be spotless when we visited them; and the quality and workmanship are very impressive. In particular, the communications spaces, which were just being brought to life by a Navy crew, had the look and smell of a new automobile. As the final stop on my visit, I was allowed to visit the magazines and the pump room in the very bottom of the ship.
It was close to quitting time when we made our way back to the hangar deck, aft to the fantail, and down the access ramps to the dock. As we sat waiting for our tired leg muscles to loosen, the shift alarm went off, and we watched 2,600 NNS workers come off shift and head for home-an impressive sight. As they passed by us on the dock, I was reminded of the builders of the Egyptian pharaoh's pyramids. Both groups labored to build a wonder of the world. Unlike the pharaoh's slaves who hauled and stacked the stones in the desert, these people
When the initial crew cadre came aboard Truman in early 1998, they began to help the NNS yard workers bring the ship's various systems to life. This process (ongoing until the ship is handed over to the Navy) is designed to make her ready for her 'final exams,' when the carrier will become truly seaworthy, with her reactors powered up and most of her 'plankowner' crew aboard. Combat systems tests occur when the ship is about 98 % complete, with evaluations of the radar and radio electronics, defensive weapons, and all the vast network of internal communications and alarms. After these tests, it is time for sea trials off the Virginia capes, including speed runs to evaluate the power plant. After these trials are completed, the Navy conducts one last series of inspections prior to the most important ceremony of the entire building process (at least for NNS). This is the signing of the Federal Form DD-250, which indicates that the Navy has taken possession of the vessel and NNS can now be paid!
The next six to eight months are filled with training and readiness exercises, including the traditional 'shakedown' cruise. Following this is a short period of yard maintenance (known as 'Post Shakedown Availability') to fix any problems that have cropped up. The new carrier will then spend much of her time over at the Norfolk Naval Station, moored to one of the long carrier docks, where she will get ready for commissioning. At the commissioning ceremony, the high officials, the dignitaries, and the ship's sponsor once again gather. Again there are speeches and presentations. And almost a decade after the decision was made to build this mighty warship, a signal is given, the commissioning pennant is raised, the crew rushes aboard to man the sides, and she is finally a warship in the U.S. Navy.