is breaking. Clearly, naval aviation had to 'get well' so that it could fulfill its essential task in the national security of the U.S.

All Fall Down: Naval Aviation in the 1980s

Earlier (see the third chapter), we saw how the culture of naval aviators has been forced to deal with changes in the society of the nation they serve. Unfortunately, there was more than just a morale problem to be dealt with. Material problems were also at the heart of the questioning of the credibility of naval aviation by the national leadership. Not that these were new problems-they first started over two decades ago. Naval aviation's downward slide really began back in the 1970s, when the administration of President Jimmy Carter cut off the funds for services to upgrade their equipment, an action that was coupled with an almost complete moratorium on the buying of replacement weapons and spare parts for aircraft. Carriers frequently went on cruises short of airplanes with only partially filled magazines, requiring the 'cross-decking' of planes, munitions, and equipment from ships headed home. Naval aviation was being forced to eat its 'seed corn' to fulfill the missions it had been assigned. Though the Carter Administration did eventually reverse policy and spend some badly needed funds on procurement for the sea services, by then it was too late. The damage had been done.

The next Administration-that of President Ronald Reagan and his Secretary of the Navy, John Lehman- attempted to rebuild naval aviation in the 1980's. Lehman was a smart, energetic man, with a strong sense of purpose. But he could not instantly do everything that needed to be done, so priorities had to be set. His vision of a '600 Ship Navy,' for example, meant that since naval vessels had the longest procurement time, the largest portion of early funds from the huge Reagan-era defense expenditures would have to go into shipbuilding. He did find funds to replenish the weapons and spare parts inventories, however, and within a few years, the existing aircraft fleet was flying and healthy. But the question of how to build the right mix of aircraft in adequate numbers was a problem that would defy even Secretary Lehman's formidable powers of organization, persuasion, and influence. Under his '600 Ship' plan, the numbers of carriers and air wings (CVWs) were to be expanded and updated. An active force of fifteen carriers would be built up, with fourteen active and two reserve CVWs to fill their decks. To provide some 'depth' to the force, the reserve CVWs would be given new aircraft, so they would have the same makeup and equipment as the active units.

Unfortunately this plan contained the seeds of a disaster. The basic problem was airframes-or more specifically, the shortage of them. Because of financial constraints, the Navy had not bought enough aircraft in the 1970's to flesh out sixteen CVWs. Furthermore, the sea services were already heavily committed to the replacement of their force of F-4 Phantom fighters and A-7 Corsair II attack jets with the new F/A-18 Hornet. Normally, the Navy tries to stagger such buys, so that only one or two aircraft types are being modernized at any given time. Now, however, Secretary Lehman was faced with buying or updating every aircraft type in the fleet virtually simultaneously. Either way, the cost would be astronomical.

During this same time, the Soviet Union, under the new leadership of Mikhail Gorbachev, was not quite the 'evil empire' it had been under Khrushchev, Brezhnev, and Andropov. Meanwhile, the growing federal budget deficits began to take their toll on the defense budget. At a time when the Navy's budget needed to be increasing, the decline of the Soviet Empire and growing domestic problems at home made a continued arms buildup seem unnecessary, and so the Navy was not able to obtain the funding it needed.

When John Lehman left the Administration in 1986 for a career in the private sector, the budget for procuring new aircraft was already being slashed. Far from building sixteen fully stocked CVWs, the Navy's focus now became building just one new type of aircraft for the 1990s. That one airplane, the A-12 Avenger II, came close to destroying naval aviation. Few people outside the military are aware of the A-12 program. Though not actually a 'black' program, the shadow of secrecy that shrouded it was at least charcoal gray.[45] The A-12 was designed to replace the aging fleet of A-6 Intruder all-weather attack bombers, but the exact roots of the aircraft are still something of a mystery, though some details have come to light.

Back in the 1980s, the first major arms reduction accord signed between the Reagan and Gorbachev governments was a controversial agreement known as the Intermediate Nuclear Forces (INF) treaty. The INF treaty completely eliminated several whole classes of land-based nuclear weapons, and severely restricted others. Under this agreement, both sides would remove land-based nuclear missiles based in Europe, and aircraft capable of nuclear weapons delivery would be limited and monitored. This was a significant reduction in theater nuclear stockpiles, and at least gave the appearance of a reduced threat of regional conflict. The appearance was not quite the reality, however, because both sides wanted to maintain as large a regional nuclear stockpile as possible. As might be imagined, both sides began looking for loopholes.

U.S. defense planners immediately noticed that sea-based nuclear-capable aircraft and cruise missiles were not counted or monitored under the INF accord-which meant that the existing fleet of A-6's and F/A-18's could immediately provide an interim replacement for the lost nuclear missile fleet. As good as that was, it wasn't good enough. What the nuclear planners really wanted was a carrier aircraft that would hold even the 'hardest' targets in the Soviet Union and Warsaw Pact countries 'at risk,' and that would do it with impunity.

The Navy was thus directed by the Department of Defense (DoD) to develop such an aircraft. The DoD wanted an aircraft that could replace a variety of attack bombers, including the A-6 Intruder, F-111 Aardvark, and even newer aircraft like the F-117A Nighthawk and F-15E Strike Eagle. The program would be developed in total secrecy, and would take advantage of the new technology of passive electromagnetic stealth, much like the F-117 Nighthawk and the B-2A Spirit. It would carry a two-man crew, have the same levels of stealth as the B-2A, and carry a new generation of precision munitions (some possibly with nuclear warheads) guided by the new NAVISTAR Global Positioning System (GPS). Plans had the first units being assigned to the Navy and Marine Corps, with the Air Force getting their A-12's later in the production run.

The Navy had problems with the A-12 from the very start. First, thanks to its lack of interest in the Have Blue program, the Navy knew very little about stealth-a problem that was magnified by the strange rules of 'Black' programs, which required them to almost reinvent the technology from scratch. USAF contractors were not allowed to transfer their experience with the F-117 and B-2 programs to the Navy and to potential contractors for the A-12. Even companies like Lockheed and Northrop, who already had stealth experience, were restricted from transferring their corporate knowledge to their own teams developing A-12 proposals. Furthermore, the Navy program management lacked experience in taking a small 'Black' research project and turning it into a large, multi-billion- dollar production program. From the beginning, progress was slow and costs were high.

The winning entry in the A-12 competition came from the General Dynamics/McDonnell Douglas team, utilizing a strange-looking design that had been under development by General Dynamics since 1975. Because of its triangular flying-wing shape, it was quickly nicknamed 'the flying Dorito.' Designated the A-12 Avenger II (after the famous World War II torpedo bomber), it was designed to carry up to 10,000 lb/4,535 kg of ordnance in internal weapons bays. It also would have had enough unrefueled range to hit targets in Eastern Europe if launched from a carrier in the Mediterranean Sea. Unfortunately, the A-12 would never make it off the shop floor, much less onto a carrier deck.

From the start of the A-12 engineering and development effort, there were disagreements between the Navy program managers and the contractor team over a number of issues. The plane was too heavy, for one thing, and there were difficulties creating the composite layups that made up the A-12's structure. Costs escalated rapidly. While the Navy has never officially acknowledged this, it appears that every other major Naval aircraft program was either canceled or restructured in order to siphon money to the troubled A-12. What is known is that during the time when the A-12 was suffering its most serious developmental problems, the upgraded versions of the F-14 Tomcat fighter and A-6 attack bomber were canceled outright, and several other programs took severe budget hits. The situation reached the critical point in 1990, when the A-12 and a number of other major aircraft programs were publicly reviewed in light of the recent fall of Communism in Eastern Europe. By this time the Avenger program was a year late and perhaps a billion dollars over budget. Even so, in his major aircraft program review presentation to Congress, then-Secretary of Defense Dick Cheney declared the A-12 to be a 'model' program.

Nine months later, he radically changed his tune. Though what the DoD and Navy were thinking at this time remains something of a mystery, the pending commitment of an additional half-billion dollars to the A-12 program

Добавить отзыв
ВСЕ ОТЗЫВЫ О КНИГЕ В ИЗБРАННОЕ

0

Вы можете отметить интересные вам фрагменты текста, которые будут доступны по уникальной ссылке в адресной строке браузера.

Отметить Добавить цитату